About Kore Digital Limited

Architecting India's Physical & Digital Future

Kore Digital Limited (KDL) operates as a premier infrastructure architect specialising in telecommunications and deep-tech manufacturing — building the connectivity, compute, and precision-hardware layers that power India's next decade.

Operational Scale

Key figures at a glance.

0km
High-Speed Optic Fiber Corridor
0+Cr
Projected Concession Revenue Pipeline
0GW
AI Datacenter Target Capacity
0.000mm
Precision Aerospace Scanning Accuracy
Industrial Core

The pillars of our business.

Pillar A · Telecommunications Backbone

15-Year Concession Framework

The Samruddhi Mahamarg Flagship Corridor

Our flagship project is the Samruddhi Mahamarg, a 701-km corridor where we are deploying a high-speed optic fiber duct backbone. This 15-year concession involves laying six ducts to facilitate high-speed connectivity, with total expected revenue exceeding ₹1,500 Cr upon completion.

Fiber optic cable spools staged for the Samruddhi Mahamarg corridor deployment
Live Deployment

Samruddhi Mahamarg Corridor

701 km · 6-duct fiber backbone

Pillar B · Deep-Tech Additive Manufacturing

Advanced Material Defensibility

Precision Engineering & Additive Manufacturing

Through our strategic collaboration with Kore Additive Manufacturing and Medical Reconstruction Pvt. Ltd., we pioneer reverse engineering and additive manufacturing for the medical, defense, and aerospace sectors. Utilising advanced hardware including the Zeiss 3D Scanner (0.025 mm accuracy) and the Meltio M450 metal printer, we manufacture critical spares in high-performance materials such as Titanium and Nickel Alloys.

Field Operations

Connectivity Backbone, Built on the Ground

From tower sites to trunk fiber, we build and operate the physical infrastructure that keeps India connected — spanning telecom concessions, dark-fiber leasing, and multi-operator colocation across critical highway corridors.

240+

PoPs

6 ducts

per corridor

15 yrs

concession

Strategic Growth Pipeline

The NAINA Mumbai AI Datacenter Hub

Next-Gen AI Compute Infrastructure

Our upcoming project in the pipeline is AI Datacenter Infrastructure centred on a massive 1 GW hub in Maharashtra's NAINA region. Designed to act as a secure, sovereign “Digital Safe Haven”, this hub is engineered to anchor the intensive compute loads of the next generation of artificial intelligence.

1 GW

Target Compute Capacity

NAINA

Maharashtra Region

AI-Ready

Sovereign Infrastructure

Latest Investor Communication

Q4 FY25 financial performance.

Audited consolidated results and management commentary — a stellar year marked by 200%+ growth in total income, driven by successful execution of the Samruddhi Mahamarg fiber project.

KDL-Q4-2025.pdf

34 pages · 3.1 MB

LATEST
FY25 ConsolidatedQ4 FY25

Total Income

+0%

₹327.82 Cr

FY24 · ₹105.08 Cr

EBITDA

+0%

₹47.55 Cr

FY24 · ₹17.08 Cr

14.50% margin

Net Profit

+0%

₹31.70 Cr

FY24 · ₹11.49 Cr

9.67% margin

All figures in ₹ Crores from consolidated financial statements for the year ended 31 March 2025. Refer to the full presentation for detailed segment reporting, cash flow, and balance sheet disclosures.

Mr. Ravindra Doshi, Managing Director of Kore Digital Limited

“We are proud to report a stellar performance in FY25, marked by over 200% growth in total income, a strong endorsement of our execution capabilities and strategic decisions. This growth has been significantly driven by the successful commencement of our work on the Samruddhi Mahamarg project. With continued momentum and strategic execution, we are confident in our ability to deliver sustainable growth and long-term value for all stakeholders.”

Mr. Ravindra Doshi

Managing Director, Kore Digital Limited